High-bay LED through the warehouse, external floodlights across the yard, emergency lighting throughout, backed by a three-phase distribution upgrade with headroom for the future.
Truck Trans run a busy transport depot in Dartford. The lighting was at the limit of what the existing distribution could carry, so we re-lit the warehouse, brought the yard floodlights up to spec, installed the emergency circuits and upgraded the three-phase board to handle the new load cleanly.
Full lighting and distribution programme across a working depot, high-bay LED through the warehouse, external floods across the yard, emergency lighting on dedicated circuits and a three-phase distribution board upgrade sized for the new load with headroom built in.
Lighting design first. Lux levels set for warehouse working and forklift movement, beam spread chosen for the yard floods, emergency-lighting placement to current regs. The new three-phase board was sized for the upgraded load plus future-proofing for additional bays.
First-fix worked from scissor lift and cherry picker around the steel-frame structure, installing tray, fittings and supplies while operations continued underneath. Second fix and the DB swap were sequenced so the depot kept running through the change-over.
Cleaner light at floor level, a brighter and safer yard at night, emergency lighting on every required route and a distribution board with the capacity to take on whatever comes next. Full test pack and certification handed over at completion.
Lighting load, yard floods, emergency circuits and the board behind them, designed together, installed without shutting the operation down. Send the layout and we'll come back with a project quote.