House is 25+ years old
Properties not rewired since the 90s are likely below current regs and degrading.
Full and partial house rewires for homeowners and landlords, stand-alone or wrapped into a wider renovation. Quoted in writing. Tested and certified at sign-off. Most rewires take 5–10 working days.
If two or three of these sound familiar, it's worth booking an EICR before deciding.
Properties not rewired since the 90s are likely below current regs and degrading.
Rubber/cloth cabling and round-pin sockets are usually beyond repair.
Repeated tripping, warm sockets or scorch marks are signs the installation is failing.
If you're extending, it's cheaper to rewire now than retrofit after plastering.
Where the report shows widespread issues, a rewire often beats circuit-by-circuit remedials on cost.
Buyers want certified electrics. Landlords need a satisfactory EICR. A rewire delivers both.
We walk the property with you, check the existing installation, and understand what you want changed or added.
Itemised quote covering first fix, second fix, consumer unit, testing and certification. Stage payments agreed up front.
First fix → plastering → second fix. Slotted into your renovation programme if there is one.
Every circuit tested, EIC issued, Part P notification submitted. Paperwork sent over for your file.
Most domestic rewires take 5–10 working days. A 2-bed flat is usually closer to 5; a 4-bed family home with extensions can be 10+. We'll give you a concrete timeline in the written quote.
Usually not. We work in stages so at least part of the property stays powered most of the time. Heavy plaster work after first fix is where most people stay elsewhere for a couple of nights if they can.
Yes, a partial rewire targets only the circuits that need replacing (e.g. just upstairs, or just the kitchen). It's a big chunk cheaper than a full rewire when the existing system is mostly sound.
An Electrical Installation Certificate (EIC) covering the new work, plus a Part P notification submitted to your local authority. Both go into your home file and stay with the property when you sell.
Yes, this is the easiest time to do it. We slot first fix in between joinery and plastering, then second fix once the plaster is dry. We work directly with your builder or under your project management.
North London, primarily N, NW, E, EN and HA postcodes. We've completed rewires in Highgate, Crouch End, Tottenham, Wood Green, Edmonton, Walthamstow, Enfield, Muswell Hill, Finsbury Park and surrounding areas.
Tell us about the property, age, number of bedrooms, anything you already know about the wiring. We'll come out for a free visit and follow up with a written quote.