Lea Valley Logistics needed depot-wide lighting, external floods and an upgraded three-phase distribution board. We picked the brief up after another contractor walked, and worked alongside the night-shift operations until the site was finished.
Lea Valley Logistics operates a logistics depot in Edmonton with vehicles in and out around the clock. The lighting across the warehouse and yard was a mix of ageing fittings, bright in some places, dim in others, and the distribution board feeding it all was past the point where it could take any more circuits cleanly. They needed a full lighting rebuild plus a three-phase board upgrade, organised around continuous depot operations.
"I called the team for an urgent site visit as we had been let down last minute. They were very reactive and professional, completed the job very quickly and maintained a very high standard of work." Site manager · Verified review, EN1
The site was scoped end-to-end before any tools came out, high-bay positions plotted to the rack layout, emergency lighting placed against the means-of-escape routes, and external floods aimed for both yard manoeuvring and security. We brought a scissor lift in for the steel-frame mounts and worked the bigger phases in night and weekend windows so the day-shift kept moving.
Depot staff aren't squinting in dim aisles any more, the yard is safe to manoeuvre after dark, and the board has the headroom to take whatever the next operational change asks for. The site has stayed on our books for the regular EICR cycle and ad-hoc reactive jobs.
High-bay, floods, emergency lighting, three-phase distribution, phased around your operations, tested and certified, ready for the next ten years.