Option 3, Trusted, In Your Home or On Your Site · Private demo for Aaron · Back to options
Industrial · Logistics · Dartford

High-bay, three-phase and emergency lighting through a working depot, called out when others let them down.

Truck Trans needed depot-wide lighting, external floods and an upgraded three-phase distribution board. We picked the brief up after another contractor walked, and worked alongside the night-shift operations until the site was finished.

Warehouse interior under the finished high-bay scheme, a working depot, lit clean.
Sector
i.Industrial · Logistics
Location
ii.Dartford, DA postcode
Scope
iii.High-bay, floods, 3-phase DB
Sign-off
iv.Tested & certified

The brief

Truck Trans operates a logistics depot in Dartford with vehicles in and out around the clock. The lighting across the warehouse and yard was a mix of ageing fittings, bright in some places, dim in others, and the distribution board feeding it all was past the point where it could take any more circuits cleanly. They needed a full lighting rebuild plus a three-phase board upgrade, organised around continuous depot operations.

"I called the director Aaron for an urgent site visit as we had been let down last minute. Aaron was very reactive and professional, completed the job very quickly and maintained a very high standard of work." Site manager · CheckATrade, EN9

What we did

The site was scoped end-to-end before any tools came out, high-bay positions plotted to the rack layout, emergency lighting placed against the means-of-escape routes, and external floods aimed for both yard manoeuvring and security. We brought a scissor lift in for the steel-frame mounts and worked the bigger phases in night and weekend windows so the day-shift kept moving.

  • High-bay LED scheme through the main warehouse, even lux levels across the rack layout.
  • External floodlighting around the yard and vehicle apron, security and night-shift visibility.
  • Emergency lighting on means-of-escape routes, tested and certified to BS 5266.
  • Three-phase distribution board upgrade with proper circuit segregation and headroom.
  • All cabling on tray and trunking through the steel frame, accessible for future additions.

What changed

Depot staff aren't squinting in dim aisles any more, the yard is safe to manoeuvre after dark, and the board has the headroom to take whatever the next operational change asks for. The site has stayed on our books for the regular EICR cycle and ad-hoc reactive jobs.

Depot, warehouse or production site?

High-bay, floods, emergency lighting, three-phase distribution, phased around your operations, tested and certified, ready for the next ten years.