Option 3 · Development & Planning Focus · Concept demo · Back to options
Lead service · Planning & feasibility

Planning is a case to be made. We make it well.

As trained, registered & insured architects, we understand the planning system, and where the design case is strong, we challenge the local authority. Clients have come away with consents that might not initially have been granted. That's the skill of an architect, and why it's vital you find a professional to serve you.

For developers, investors and homeowners, first-time developers welcome.

Hand-drawn plan and elevation studies with fineliner pens on the drawing board
Working sketches · plan and bay studies, OnPoint studio
Design Feasibility Report
Existing & proposed drawings
3D visualisations
Design & Access Statement
Pre-application advice
01 /The deliverables

What a planning commission includes

Four documents do the heavy lifting on most planning applications. You receive all of them, produced in-house, by the architect who will argue your case.

D.01

Design Feasibility Report

A written appraisal of what your site or property can realistically take, constraints, design options and the likely planning route, before you commit to detailed design or a purchase.

D.02

Existing & proposed drawings

A full set of existing and proposed drawings, plans, elevations and sections, measured, accurate and presented to planning standard.

D.03

3D visualisations

High-quality interior and exterior visualisations of the proposed scheme. Planners, neighbours and clients see exactly what's intended, clients credit these renders with carrying complex applications.

D.04

Design & Access Statement

The document that makes the planning argument: how the design responds to its context and policy, and why it should be approved. Written to persuade, not to tick a box.

D.05

Pre-application advice

Where it strengthens the case, we consult the local planning authority before submission, so we know how the scheme is likely to be received and can adjust the strategy early.

D.06

Onward technical package

Once consent is in, the same drawings develop into Building Regulations and tender packages, technically robust, so contractors can price and build the approved scheme accurately.

02 /When to start here

Signs you need a feasibility study first

  • You're weighing up a site or property purchase and need to know its potential before committing capital.
  • You want tailored design options, with the trade-offs set out, rather than a single scheme.
  • You're unsure of the planning route: permitted development, full application, or pre-application first.
  • The site is sensitive, a conservation area, a tight plot, wary neighbours, and the case needs to be made carefully.
  • A previous application was refused and you want a professional view on a route that addresses the reasons.
Request a feasibility conversation
Site analysis diagram with sun path and 45-degree studies alongside existing and proposed floor plans for The Stables
Site analysis & plan studies · The Stables, Bedford
03 /The planning journey

Three phases, clearly staged

The planning-facing half of our six-stage service, each phase ends with a deliverable in your hands.

Phase i · Appraise

Brief, survey & feasibility

Site appraisal and survey, your needs and budget understood, then a Design Feasibility Report setting out the options and the planning route.

Phase ii · Design

Sketch & developed design

Sketch options through CAD, hand sketches and 3D visualisations; the preferred design developed in consultation with the local planning authority.

Phase iii · Apply

Application & advocacy

The application submitted with drawings, visualisations and the Design & Access Statement, and the case argued with the local authority until it's decided.

04 /Planning outcomes, in clients' words

The reviews that matter on this page

All five-star, all real, from Google and MyBuilder.

★★★★★Google
"Highly recommend OnPoint Architects. They assisted me in getting planning permission on a complex residential project in London with detailed 3D renders of the proposed works. Smooth process and received everything promptly."
Matthew Thompson · Google review
★★★★★Google
"Being a first time developer, they went out of their way to explain the stages, offer reassurance and advice. They put my application in and permission was approved two weeks later for an extension of my garden and a loft conversion in Northolt."
Kadafi Adam · Google review
★★★★★Google
"OnPoint Architects were successful in obtaining planning permission for my loft conversion in a conservation area. It was tricky but I was very impressed with the way OnPoint dealt with the matter. The 3D drawings / designs and attention to detail are amazing."
Maureen Juliana-Harvey · Google review
★★★★★MyBuilder
"Yilmaz handled the planning application for our front and rear extension with care and efficiency, ensuring everything was thorough and well-prepared. Thanks to his hard work, our application was approved quickly, much sooner than we anticipated."
MyBuilder client · Bexleyheath · front & rear extension
05 /Common questions

Planning & feasibility FAQs

What does a Design Feasibility Report actually tell me?

What the site or property can realistically take, the constraints, the design options and the likely planning route, so you can decide whether to commit before spending on detailed design. For developers, that often means before purchase.

What if the council is likely to resist the scheme?

That's where a chartered architect earns their fee. We consult the authority as the design develops, build the case in the Design & Access Statement, and challenge the planners where the design deserves it, clients have ended up with approvals that might not initially have been granted.

Do I need pre-application advice?

Not always. On sensitive or higher-value sites it can de-risk the application by testing the scheme with the local authority first. We'll tell you plainly whether it's worth it for your project.

How long does planning take?

Local authority timescales vary and are outside anyone's control, but a well-prepared application moves faster. Clients have reported permission in as little as two weeks from submission, and approvals "much sooner than we anticipated".

What happens after consent?

The approved design develops into Building Regulations drawings and a tender package, drawings and specifications precise enough for contractors to price accurately and build exactly what was approved.

Feasibility report · Drawings · 3D visualisations · Design & Access Statement

06 / Got a site to test?

Tell us about the property or plot.

Include what you want from it and any planning history you know of. You'll get a clear, professional view on feasibility and the route to consent.